POLYETHYLENE SLEEVING

JOINT SLEEVING
  • Lower the pipe into the trench.

  • Joint the pipe with appropriate equipment. The fold must still be at the top of the pip

  • Bring the joint sleeve over the socket and spigot. A sufficiently large excavation must have been under the joint to allow satisfactory application of this sleeve, (room for tape wrapping and ties).

SLEEVING OF FITTINGS

  • Use the same polyethelene sleeving to protect fittings. Depending on their shape, two or three pieces of sleeving maybe necessary. Application must comply with the same recommendations (particularly fitting the sleeving as snugly as possible).

 

 

 

 

 

 

 

 

 

 

 

 